Monti
Occasional Contributor

Help with Level 1 7.2.1

Screen Shot 2021-03-08 at 2.58.01 AM.pngHello,

I've tried a handful of combination with this import, but I'm just not grasping the mapping concept even after the tutorials. Could someone please help me match this up? ThanksScreen Shot 2021-03-08 at 3.00.19 AM.pngScreen Shot 2021-03-08 at 3.00.31 AM.png

3 REPLIES3
BCSFB
Certified Master Anaplanner

Hi@Monti,

Thanks for sharing your issue with us.

It seems like you have time as a "list" in you system module "SYS06".
You wouldn't need time in your system modules unless it is a time system module.
When you create a new module time is added as a "list" by default. Therefore, you need to remove it when creating modules that don't require time.
In your case you can go into blue print and change the time scale to not applicable for all line items and module.

BCSFB_0-1615201211461.png

Then you dont have to worry about mappnig time

BCSFB
Certified Master Anaplanner

For your product mapping you should be using code.
JaredDolich
Moderator

@Monti

Try removing the calendar from SYS06. You don't need a TIME dimension on your system module. That should fix that up right away!


Jared Dolich