I'm working through the Level 2 training and think I found a typo:
In
LEVEL 2 MODEL BUILDING: SPRINT 3 Activity: Create Combination Chart for Dashboard
Before you publish theSYS01 Time Settings by Month module, showing the Planning Period Filter line item, filter it to show months only and save the view as Filter for Product Replenishment Dashboard
SYS01 is the Time Settings byWeekmodule.
Can you clarify what module we should be using?
Thanks!
Joe
When you start the L2 training, you are asked to download a copy of the modelLevel 2 Supply Chain Startand rename it to Level 2 Supply Chain [your name{
If you happen to have downloaded your version before Chris made changes to the model then you won’t have the latest version of these changes.
I reviewed the names of the modules In the instruction with my copy of the model and they match.
Yes, I downloaded a copy and renamed it.
I still do not think we are on the same page here. How can there be 2 different activities, with 2 different names of the modules, and my model matches the 1st activity, as well as all previous activities? Everything matched until this point in the training (Sprint 3). Happy to setup a call if needed.
You are right. I might not be seeing your point clearly.
unfortunately if there is indeed something wrong with your model/instruction then I’m not the person to solve it for you.
Chris is your guy
or even better send an email to academy@anaplan.com
Let us know when you figure it out.
@adamsjk@ChrisMullen@einas.ibrahim
Hi there,
我有一个问题my chart and filter line item are not syncing. All the weeks are shown on my graph and whenever I select specific months, there is no change. I have refreshed multiple times but still do not have any results, any help would be great!