Yogitha
New Contributor

L1MB 9.2.5

error when im adding 5.00% to Rev04error when im adding 5.00% to Rev04is it a formula there or just type 5.00%

1 ACCEPTED SOLUTION

Accepted Solutions
RavinderB
Regular Contributor

@Yogitha

Hi

This module does not require formulas as described by@JaredDolich

Please follow the instructions to set the module correctly, in the next activity you will need to import the data correctly from the CSV file into the module

Thank you

Ravinder

View solution in original post

2 REPLIES2
JaredDolich
Moderator

@Yogitha

Both of those line items should be editable (no formula).

If you want to test the report you can add the percentage values in grid view. These are values you will let your planners enter, so they need to be editable.


Jared Dolich
RavinderB
Regular Contributor

@Yogitha

Hi

This module does not require formulas as described by@JaredDolich

Please follow the instructions to set the module correctly, in the next activity you will need to import the data correctly from the CSV file into the module

Thank you

Ravinder